Rail transportation safety investigation R16D0092

The TSB has completed this investigation. The report was published on 11 December 2017.

Table of contents

    Crossing collision
    VIA Rail Canada Inc.
    Passenger train No. 600
    Mile 75.34, Canadian National Railway Company
    Joliette Subdivision
    Sainte-Ursule, Quebec

    The occurrence

    On 20 September 2016, at approximately 1605 Eastern Daylight Time, VIA Rail Canada Inc. passenger train No. 600 was travelling southward at 60 mph on the Canadian National Railway Company Joliette Subdivision. The train was struck by a tractor-trailer at the Highway 348 public crossing at Mile 75.34 in Sainte-Ursule, Quebec. The first coach derailed, and the rail cars as well as the locomotives were damaged. Approximately 1860 gallons of fuel was spilled. The track and the crossing warning system were also damaged, and the tractor-trailer was destroyed. The driver sustained serious injuries, and 2 passengers on the train sustained minor injuries.

    Safety communications

    Safety advisories

    2017-12-11

    Rail Safety Advisory Letter 10/17: Assessment of the safety impact of road accidents in the vicinity of railway crossings

    Media materials

    News releases

    2017-12-11

    Obstructed view of crossing warning system among factors that led to 2016 crossing collision in Sainte-Ursule, Quebec
    Read the news release

    Deployment notice

    2016-09-20

    TSB has deployed a team of investigators to a railway crossing collision in Sainte-Ursule, Quebec

    The Transportation Safety Board of Canada (TSB) has deployed a team of investigators following a collision between a tractor-trailer and a VIA Rail Canada passenger train in Sainte-Ursule, Quebec. The TSB is gathering information and assessing the occurrence.


    Investigation information

    Map showing the location of the occurrence

    R16D0092

    Crossing collision
    VIA Rail Canada Inc.
    Passenger train No. 600
    Mile 75.34, Canadian National Railway Company
    Joliette Subdivision
    Sainte-Ursule, Quebec

    Investigator-in-charge

    Image
    Photo of Ian Perkins

    Mr. Perkins worked with Canadian Pacific Railways for 10 years as conductor and engineer. More recently, he was involved in training and recertifying of locomotive engineers and conductors. He recently joined the TSB as Investigator in the Quebec Region.


      Download high-resolution photos from the TSB Flickr page.

    Class of investigation

    This is a class 3 investigation. These investigations analyze a small number of safety issues, and may result in recommendations. Class 3 investigations are generally completed within 450 days. For more information, see the Policy on Occurrence Classification.

    TSB investigation process

    There are 3 phases to a TSB investigation

    1. Field phase: a team of investigators examines the occurrence site and wreckage, interviews witnesses and collects pertinent information.
    2. Examination and analysis phase: the TSB reviews pertinent records, tests components of the wreckage in the lab, determines the sequence of events and identifies safety deficiencies. When safety deficiencies are suspected or confirmed, the TSB advises the appropriate authority without waiting until publication of the final report.
    3. Report phase: a confidential draft report is approved by the Board and sent to persons and corporations who are directly concerned by the report. They then have the opportunity to dispute or correct information they believe to be incorrect. The Board considers all representations before approving the final report, which is subsequently released to the public.

    For more information, see our Investigation process page.

    The TSB is an independent agency that investigates air, marine, pipeline, and rail transportation occurrences. Its sole aim is the advancement of transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability.