TSB Recommendation R07-02

Rail Testing, Inspection, and Maintenance

The Transportation Safety Board of Canada recommends that the Department of Transport establish standards requiring that rails approaching their fatigue limit be replaced.

Rail transportation safety investigation report
Date the recommendation was issued
Date of the latest response
December 2010
Date of the latest assessment
February 2011
Rating of the latest response
Fully Satisfactory
File status
Closed

All responses are those of the stakeholders to the TSB in written communications and are reproduced in full. The TSB corrects typographical errors in the material it reproduces without indication but uses brackets [ ] to show other changes or to show that part of the response was omitted because it was not pertinent.

Summary of the occurrence

On 03 August 2005, at 0509 Mountain daylight time, Canadian National (CN) freight train >M30351-03, proceeding westward from Edmonton, Alberta, to Vancouver, British Columbia, derailed 43 cars, including 1 loaded car of pole treating oil, 1 car of toluene (UN 1294), and 25 loaded cars of Bunker C (heavy fuel oil) at Mile 49.4 of the Edson Subdivision near Wabamun, Alberta. Approximately 700 000 litres of Bunker C and 88 000 litres of pole treating oil were spilled, causing extensive property, environmental, and biological damage. About 20 people were evacuated from the immediate area. There were no injuries.

Rationale for the recommendation

The Railway Track Safety Rules do not provide any guidance on fatigue life, nor are there common industry standards for rail life based on accumulated tonnage and the properties of the steel.

CN has developed its own Rail Defect Tracking System (RDTS), which is, in part, able to track the history of maintenance rails. Maintenance rails are selected based on observed wear and conformity to the profile of the parent rail. Neither the quality of steel nor the accumulated tonnage is factored into this decision.

In this occurrence, a maintenance rail failed because it had reached the end of its fatigue life. Because of the way the defects developed in the rail, they could not be identified by the available inspection tools. The rail was installed because it matched the profile of the parent rail; no consideration was given to matching the steel specification of the maintenance rail with the parent rail.

Inspection programs are the primary defence against rail fractures. Recognizing the limitations of existing inspection tools, there is a requirement for additional strategies to ensure that maintenance rails are not installed where they are likely to have a shorter fatigue life than the parent rail.

Current Transport Canada (TC) rules focus primarily on geometric criteria and there is no requirement to establish the fatigue life of rails. Furthermore, there are no common industry guidelines for rail life based on accumulated tonnage, defects or steel quality. In the absence of industry standards for rail fatigue life, rails can remain in track beyond their fatigue limit. This increases the risk of sudden rail failure and derailment. Therefore, the Board recommended that:

The Transportation Safety Board of Canada recommends that the Department of Transport establish standards requiring that rails approaching their fatigue limit be replaced.
Transportation Safety Recommendation R07-02

Previous responses and assessments

January 2008: Transport Canada's Response to R07-02

TC has already started work with industry to develop a long-term strategy to modernize the Track Safety Rules that will take into consideration the establishment of standards for the quality and strength of maintenance rails and for rails approaching their fatigue limit.

April 2008: Board Assessment of Response to R07-02 (Satisfactory Intent)

TC has acknowledged the deficiency and indicated that future revisions to the Track Safety Rules will take into consideration the establishment of standards for rails approaching their fatigue limit. As it is too soon to evaluate the outcome of TC's proposal, the Board assesses the response to Board Recommendation R07-02 as having "Satisfactory Intent".

June 2010: Additional Response to R07-02

The Track Safety Rules are being revised and reviewed. TC indicates that this item is planned for the next revision of the Track Safety Rules.

June 2010: Board Reassessment of Response to R07-02 (Satisfactory Intent)

As the revision is still planned to be included and it is too soon to evaluate the outcome of TC's proposal, the Board reassesses the response to Recommendation R07-02 to remain as having "Satisfactory Intent".

Latest response and assessment

December 2010: Additional Information From the Railway Industry

By definition, the fatigue limit (life) for plain to medium carbon steels occurs when a fatigue defect is initiated. For rail, the development of shelly surface, fatigue spalling, gauge corner cracking etc. would suggest that a fatigue threshold has been reached. To protect against the development of fatigue related defects, the primary defences are rail grinding, Track Geometry Testing (which also measures rail wear) and Ultrasonic Rail Testing (UT). The TC Track Safety Rules outline the minimum frequency for Track Geometry testing (twice per year on most main track) and UT testing (at least once a year). However, both CN & CP now greatly exceed the number of specified frequencies on most main track.

February 2011: Board Reassessment of Response to R07-02 (Fully Satisfactory)

This increased monitoring is a pro-active maintenance activity that identifies rails which have emerging fatigue related defects, so that the rails can be repaired or replaced. Therefore, the Board reassesses the response to Recommendation R07-02 as being "Fully Satisfactory".

File status

This file is assigned a "Closed" status.