Table 1. Reportable Pipeline Occurrences, April 2025

 

April

Year to date (April)

2025

2024

2020-2024 average

2025

2024

2020-2024 average

Total number of occurrences366192122
Total number of occurrences with product release022947
Total number of serious injuries000000
Total number of fatalities000000
Accidents010011
Product released010011
Release of hydrocarbon gas010010
Release of HVP hydrocarbons1000000
Release of LVP hydrocarbons2, 3000000
Release of other product000000
Release from line pipe body010011
Fire/Ignition010010
Explosion010010
Rupture010011
Pipeline contacted by object000000
Operation beyond limits000000
Geotechnical/Hydrotechnical/Environmental activity000000
Incidents355192021
Product released012937
Release of hydrocarbon gas011924
Release of HVP hydrocarbons1000000
Release of LVP hydrocarbons2, 3000012
Release of other product000001
Release from line pipe body000101
Fire/Ignition000122
Explosion100121
Pipeline contacted by object101545
Operation beyond limits141273
Geotechnical/Hydrotechnical/Environmental activity001043
Unauthorized 3rd-party activity affects pipeline structural integrity000001

Data extracted 20 May 2025

NOTES:

1 HVP means high vapour pressure as defined in Canadian Standards Association Standard Z662.
2 LVP means low vapour pressure as defined in Canadian Standards Association Standard Z662.
3 As of July 2014, the minimum reporting threshold for releases of low vapour pressure hydrocarbons was established at 1.5m3.